See this link for the most complete and recent information on this record: https://repository.californiarevealed.org/node/397276.Abstract: The goal of the report is to provide an annual performance update of the project site along Adobe Creek, downstream of West Edith Avenue, for five (5) years after the project is completed. Six cross sections and one longitudinal channel along the project area profile shall be surveyed annually with results and variances presented within this report. Construction was completed in 2008." -- page 1.